Showing posts with label cabinets. Show all posts
Showing posts with label cabinets. Show all posts

Monday, October 18, 2010

end...scene

































The Resources


Cabinets: Rutt HandCrafted Cabinetry, Fusion.
Construction: Frameless Contemporary
Door and Drawer Style: New Yorker
Color/Finish: Valspar 80 White Paint, 10 Flat Sheen

Hardware: Restoration Hardware Aubrey knobs in polished nickel; Classic Brass cup pulls in polished nickel; Rejuvenation cabinet latch in polished nickel; Blum hinges; soft-close drawers

Countertops: Moon Night granite, polished

Backsplash: Waterworks Architectonics handmade subway field tile in Mykonos; Scotia liner in Mykonos

Floor: Ann Sacks porcelain floor tile: Vault in Carbon, Dimensions: 11 7/8" x 23 5/8"

Sink: Franke KBX11021 undermount stainless steel sink

Faucet: Perrin & Rowe Single Lever Single Hole Mixer with Sidespray U.4746 in polished nickel

Dishwasher: Miele G1262SCVI Fully Integrated 18-inch Dishwasher

Refrigerator: Sub-Zero 700TCI with pro handle

Range: Wolf 30" Gas Range with pro handle

Hood: Wolf 22" depth Pro Wall Hood

Undercabinet lighting: Task Luche Xenon LX Series

Overhead lighting: Hudson Valley Lighting Haverhill pendant

Wall and ceiling paint: Benjamin Moore Decorator's White in Eggshell

Wednesday, September 1, 2010

the cabinets


Kitchen cabinets are done and done!


No hood yet.

Tuesday, August 31, 2010

the install

After a week's delay, the cabinets are finally getting installed! And it's a glorious site. I can't believe they are actually in the kitchen and it makes me feel like things are moving along...that we're not just living with a newly installed floor as our only accomplishment after practically a month.

There was much banging and drilling and other crazy machine like noises that I could not bring myself to look into. As well as some curses of "Oh sh-t! Oh sh-t!" Great. The cabinet installer is cursing over what a masterpiece he has created, right? Right?! When I inquired, he said there were no problems, everything's going well.

And as far as I can see, things seem in order.


Hello, bases. You please me, yes you do.


And hello, uppers. How nice you look up close to the ceiling.


The left side of the kitchen. Sitting pretty.


And the right side of the the kitchen. Hello, lover.

Friday, August 20, 2010

the delay


Doh! Our first real delay. And it involves the cabinets!! Nooooo....Here I was, for the last three months, living with the deadline of August 23rd in mind. That was the day the cabinets were to arrive. That was the day I kept anxiously telling every worker: Will this be done by then? This has to be done by then! The cabinets are coming, people! THE CABINETS ARE COMING! (Clap your hands for emphasis here.) I mean, I was seriously the Paul Revere of kitchen cabinetry. Until I wasn't.

I found out today that, due to delays because of another job, our cabinets will in fact, NOT be coming on Monday. They will be delivered next Thursday, sit God knows where in our apartment, and be installed next Friday and the following Monday. What?! Horrors. I'll have an entire weekend to freak out with my half installed cabinets.

Monday, June 14, 2010

the cabinetry and hardware


After weeks and weeks of indecision, deliberations, measurements, discussions, nitpickings and, of course, obsessing, we finally settled on a door style called New Yorker from Rutt Cabinetry for our frameless cabinets. It has a reverse small cove panel, and everything will be in white. The people at Bilotta Kitchens were very patient and informative and put up with all my insanities over minutiae.


The drawers will be five piece, with soft-close hinges.


The knobs will be the Aubrey Knob in polished nickel from Restoration Hardware.


There will be bin pulls in polished nickel from Classic Brass on the drawers.


And a latch in polished nickel from Rejuvenation on the undersink cabinets.